{"id":15544,"date":"2011-11-25T08:35:20","date_gmt":"2011-11-25T13:35:20","guid":{"rendered":"http:\/\/www.bahamasb2b.com\/news\/?p=15544"},"modified":"2011-11-25T08:35:20","modified_gmt":"2011-11-25T13:35:20","slug":"bay-street-to-be-paved-at-night","status":"publish","type":"post","link":"https:\/\/www.bahamasb2b.com\/news\/2011\/11\/bay-street-to-be-paved-at-night","title":{"rendered":"Bay Street To Be Paved At Night"},"content":{"rendered":"<figure id=\"attachment_15545\" aria-describedby=\"caption-attachment-15545\" style=\"width: 200px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-15545\" title=\"bay-street\" src=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2011\/11\/bay-street.jpg\" alt=\"\" width=\"200\" height=\"150\" srcset=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2011\/11\/bay-street.jpg 200w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2011\/11\/bay-street-150x112.jpg 150w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><figcaption id=\"caption-attachment-15545\" class=\"wp-caption-text\">Bay Street, downtown Nassau<\/figcaption><\/figure>\n<p>Nassau, Bahamas &#8212; The Ministry of Public Works and Transport announces that the Government is in the process of rehabilitating Bay Street from Cumberland to Mackey Streets.<\/p>\n<p>The public is advised that beginning November 23 until the end of November, night-time paving will take place on Bay Street between 7 pm to 6 am. As a result road closures will be in effect for Bay Street from Cumberland Street to Elizabeth Avenue and side streets.<br \/>\nMotorists are advised to exercise caution and follow the diversion signs in place while driving in areas of construction.<\/p>\n<p>Despite road closures local access will be granted to residents and business patrons.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Beginning November 23 until the end of November, night-time paving will take place on Bay Street between 7 pm to 6 am.<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":{"facebook_10223285771444175_51037792744":""},"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[12],"tags":[186,24,119],"class_list":["post-15544","post","type-post","status-publish","format-standard","hentry","category-headlines","tag-bay-street","tag-construction","tag-roads"],"_links":{"self":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts\/15544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/comments?post=15544"}],"version-history":[{"count":0,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts\/15544\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/media?parent=15544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/categories?post=15544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/tags?post=15544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}