{"id":17582,"date":"2012-02-01T09:49:02","date_gmt":"2012-02-01T14:49:02","guid":{"rendered":"http:\/\/www.bahamasb2b.com\/news\/?p=17582"},"modified":"2012-02-08T10:23:03","modified_gmt":"2012-02-08T15:23:03","slug":"road-improvements-update","status":"publish","type":"post","link":"https:\/\/www.bahamasb2b.com\/news\/2012\/02\/road-improvements-update","title":{"rendered":"Road Improvements Update"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-17588\" title=\"wulff-kemp\" src=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/wulff-kemp.jpg\" alt=\"\" width=\"540\" height=\"250\" srcset=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/wulff-kemp.jpg 540w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/wulff-kemp-150x69.jpg 150w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/wulff-kemp-250x115.jpg 250w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/>WULFF AND KEMP \u2013 Connection of the water pipe line on Kemp Road and Wulff Road as part of the New Providence Infrastructure Improvement Project has been completed and workmen are now preparing to pave the portion of Kemp Road shown in this photograph. (BIS Photo\/Letisha Henderson)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-17587\" title=\"independence\" src=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/independence.jpg\" alt=\"\" width=\"540\" height=\"250\" srcset=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/independence.jpg 540w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/independence-150x69.jpg 150w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/independence-250x115.jpg 250w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/>EAST WEST HIGHWAY \u2013 This photo shows vehicles driving on the East West Highway that recently received its final paving as part of the New Providence Infrastructure Improvement Project. The final paving of Abundant Life Road is expected to be completed next week. (BIS Photo\/Letisha Henderson)<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-17589\" title=\"east-soldier\" src=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/east-soldier.jpg\" alt=\"\" width=\"540\" height=\"250\" srcset=\"https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/east-soldier.jpg 540w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/east-soldier-150x69.jpg 150w, https:\/\/www.bahamasb2b.com\/news\/wp-content\/uploads\/2012\/02\/east-soldier-250x115.jpg 250w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/><br \/>\nEAST STREET AND SOLDIER ROAD \u2013 Pictured is a section of East Street and Soldier Road where road works are continuing as part of the New Providence Infrastructure Improvement Project. The work includes improvements to sidewalks, medians and curbing. (BIS Photo\/Letisha Henderson)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Road works are continuing as part of the New Providence Infrastructure Improvement Project. The work includes improvements to sidewalks, medians and curbing. <\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":{"facebook_10223285771444175_51037792744":""},"rop_publish_now_history":[],"rop_publish_now_status":"pending","footnotes":""},"categories":[18],"tags":[119,62],"class_list":["post-17582","post","type-post","status-publish","format-standard","hentry","category-lifestyle","tag-roads","tag-traffic"],"_links":{"self":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts\/17582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/comments?post=17582"}],"version-history":[{"count":0,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/posts\/17582\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/media?parent=17582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/categories?post=17582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bahamasb2b.com\/news\/wp-json\/wp\/v2\/tags?post=17582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}